Jira to Linear

Jira to Linear migration checklist

A week-by-week checklist for moving from Jira to Linear, from inventory and cleanup to test imports, cut-over day and switching Jira off.

A Jira to Linear migration is a project like any other: it goes smoothly when someone owns it and works through a list. Copy this checklist into a Linear issue (or a doc) and tick things off. For the reasoning behind each step, see the step-by-step migration guide.

Four weeks before

  • Name one owner for the migration
  • Pick a cut-over date at a sprint boundary
  • List the Jira projects that move, and how much history each keeps
  • Rank what must survive: issue keys, comments, attachments, PR links, sprints, versions, watchers
  • Record issue counts and attachment storage per project
  • List custom fields in use and decide label, description or drop for each
  • List integrations: GitHub, GitLab or Bitbucket, Slack, Confluence, automation rules, webhooks
  • Choose an import method that keeps everything on the must-survive list
  • Decide how long Jira stays available read-only after the switch
  • Tell the team the date and what will change

Two weeks before

  • Clean up: close stale issues, merge duplicate labels and components
  • Map Jira statuses onto Linear workflow states (mapping guide)
  • Create the Linear workspace and invite everyone with the same email address they use in Jira
  • Create one team per Jira project, using the same key — and don't create issues in it yet
  • Set up workflow states, labels, priorities and the estimate scale for each team
  • Take a full Jira backup, including attachments, and store it outside Jira
  • Run a test import into a test team or workspace
  • Check 20 issues by hand: formatting, mentions, attachments, relations, statuses, comments

One week before

  • Fix the mapping and run the test import again
  • Walk team leads through the test import
  • Recreate the few views each team opens daily
  • Configure cycles to start on cut-over day (sprints and cycles)
  • Prepare the announcement: links to the new teams, where to ask questions
  • Give the team a 15-minute Linear intro: keyboard shortcuts, cycles, triage

Cut-over day

  • Close the last Jira sprint
  • Make Jira read-only for everyone except admins
  • Run the final import, or the final incremental sync
  • Spot-check issue keys, attachments and the newest comments
  • Connect GitHub or GitLab and Slack to Linear
  • Turn off Jira automation rules and webhooks
  • Post the announcement

After the switch

  • Replace Jira URLs in docs and wikis — one search-and-replace if keys are unchanged (keeping issue keys)
  • Check open pull requests link to Linear issues
  • Collect feedback after two cycles and adjust labels and states
  • Take a final Jira backup
  • Cancel Jira when the read-only period ends

Want this done for you? Jira-to-Linear-importer handles backup, inspection, the import and incremental sync — and for large migrations, we can guide your team through the whole list.