# Jira to Linear migration checklist

> A week-by-week checklist for moving from Jira to Linear, from inventory and cleanup to test imports, cut-over day and switching Jira off.

Published October 20, 2026 · https://jira-to-linear.com/guides/jira-to-linear-migration-checklist/

A Jira to Linear migration is a project like any other: it goes smoothly when someone owns it and works through a list. Copy this checklist into a Linear issue (or a doc) and tick things off. For the reasoning behind each step, see the [step-by-step migration guide](https://jira-to-linear.com/guides/migrate-jira-to-linear/).

## Four weeks before

- [ ] Name one owner for the migration
- [ ] Pick a cut-over date at a sprint boundary
- [ ] List the Jira projects that move, and how much history each keeps
- [ ] Rank what must survive: issue keys, comments, attachments, PR links, sprints, versions, watchers
- [ ] Record issue counts and attachment storage per project
- [ ] List custom fields in use and decide label, description or drop for each
- [ ] List integrations: GitHub, GitLab or Bitbucket, Slack, Confluence, automation rules, webhooks
- [ ] Choose an import method that keeps everything on the must-survive list
- [ ] Decide how long Jira stays available read-only after the switch
- [ ] Tell the team the date and what will change

## Two weeks before

- [ ] Clean up: close stale issues, merge duplicate labels and components
- [ ] Map Jira statuses onto Linear workflow states ([mapping guide](https://jira-to-linear.com/guides/jira-to-linear-field-mapping/))
- [ ] Create the Linear workspace and invite everyone with the same email address they use in Jira
- [ ] Create one team per Jira project, using the same key — and don't create issues in it yet
- [ ] Set up workflow states, labels, priorities and the estimate scale for each team
- [ ] Take a full Jira backup, including attachments, and store it outside Jira
- [ ] Run a test import into a test team or workspace
- [ ] Check 20 issues by hand: formatting, mentions, attachments, relations, statuses, comments

## One week before

- [ ] Fix the mapping and run the test import again
- [ ] Walk team leads through the test import
- [ ] Recreate the few views each team opens daily
- [ ] Configure cycles to start on cut-over day ([sprints and cycles](https://jira-to-linear.com/guides/jira-sprints-and-versions-to-linear/))
- [ ] Prepare the announcement: links to the new teams, where to ask questions
- [ ] Give the team a 15-minute Linear intro: keyboard shortcuts, cycles, triage

## Cut-over day

- [ ] Close the last Jira sprint
- [ ] Make Jira read-only for everyone except admins
- [ ] Run the final import, or the final incremental sync
- [ ] Spot-check issue keys, attachments and the newest comments
- [ ] Connect GitHub or GitLab and Slack to Linear
- [ ] Turn off Jira automation rules and webhooks
- [ ] Post the announcement

## After the switch

- [ ] Replace Jira URLs in docs and wikis — one search-and-replace if keys are unchanged ([keeping issue keys](https://jira-to-linear.com/guides/keep-jira-issue-keys-in-linear/))
- [ ] Check open pull requests link to Linear issues
- [ ] Collect feedback after two cycles and adjust labels and states
- [ ] Take a final Jira backup
- [ ] Cancel Jira when the read-only period ends